    Warehouse Relocation in Akron, OH

    A warehouse relocation in Akron is mostly a question of what your old rack can still do in a new room. Rubber and polymer plants near Kenmore tend to run heavy drums, bales and resin bags, and the frames holding them have often taken years of forklift contact.

    So we start at the uprights. Each one gets checked for plumb, bent bracing and base plate damage before anyone talks about trucks or move dates.

    (216) 434-6607

    Pallet Rack Relocation Out of Akron Factory Space

    Plenty of Akron product sits in older single-story and multi-story factory buildings with 14 to 24 foot clear heights. Moving into newer space off I-77 or SR-8 can change the math completely. Frames that maxed out at three levels may support four or five, if the beams are the right size and the loads are confirmed.

    Our crews work under a division of Warehouse Equipment & Supplies Co., a rack supplier and installer going back to 1997. That background helps when an old system turns out to be a discontinued teardrop style and matching beams have to be sourced before reinstall day.

    A pallet rack relocation from a plant like this is rarely a straight copy. Old rows were often squeezed between crane bays and press lines, and the new building usually rewards a cleaner grid with longer runs.

    Free warehouse consultation
    CAD layout with position counts
    Installation by experienced crews we schedule and manage
    Warehouse storage rows to be measured before relocation
    Pallet rack beams and uprights requiring identification before a move

    Akron Corridors and Load-Out Planning

    Between Kenmore, the I-76 interchange and the Akron-Canton Airport area, short hauls are common, which lets crews shuttle bundled frames in several runs instead of one oversized load. Winter moves need dry staging space at both ends so beams are not left sitting in slush.

    rubber processing
    industrial supply

    How an Akron Rack Relocation Runs

    Four stages, each finished and signed off before the next begins. Skipping one is how parts go missing between buildings.

    1

    Condition audit

    Inspect every upright, beam and connector. Tag anything bent, cracked or rusted through for replacement so it never reaches the new floor.

    2

    Destination drawing

    Produce a layout for the new building showing aisle widths, row lengths and pallet positions, matched to your truck sizes and forklift reach.

    3

    Phased teardown

    Pull rows in the order the drawing calls for, keeping one working section loaded so shipping continues while the move is under way.

    4

    Rebuild and match

    Reinstall, anchor and add any new frames or beams needed to fill the layout, matched to the existing profile and capacity.

    Warehouse Relocation Scope for Akron Plants

    Most Akron jobs mix reused rack with some new material. We price the two separately so you can see exactly what reuse is saving and where replacement is unavoidable.

    Heavy polymer loads make beam selection matter. If the new layout runs taller bays, we recheck beam capacity against your real pallet weights rather than assuming the old rating still applies at the new elevation.

    Inventory has to land somewhere during the gap. We help plan temporary floor staging and the sequence that empties one zone just before its rack is rebuilt across town.

    When the rack relocation wraps up, you get an as-built drawing with position counts. Future additions then start from a record of what is really standing on the floor.

    More Akron storage options worth a look before the move:

    Plants leaving older Kenmore-area buildings
    Heavy drum, bale and resin storage
    Moves that add levels in taller space
    Mixing reused frames with new beams
    Call (216) 434-6607

    Recent Installations

    Racking projects completed for warehouses across Greater Cleveland and Northeast Ohio.

    Pallet rack installation
    Pallet rack installation
    Pallet rack installation
    Pallet rack installation
    Pallet rack installation
    Pallet rack installation
    Pallet rack installation
    Pallet rack installation
    Pallet rack installation
    Pallet rack installation

    Get a Warehouse Relocation Quote for Your Akron Warehouse

    Moving an Akron plant or warehouse? Share both addresses, a rough rack count and a few photos; a free design consultation follows.

    Cleveland Pallet Rack

    11811 Shaker Blvd.

    Ste 204 #1118

    Cleveland, OH 44120

    (216) 434-6607

    Monday - Friday: 8:00 AM - 6:00 PM

    We respect your privacy. Your information will never be shared.

    Akron Warehouse Relocation FAQs

    Where We Work

    Located in Cleveland, we serve the entire Northeast Ohio with industrial pallet racks and warehouse storage solutions.

    Cleveland Pallet Rack

    Address

    11811 Shaker Blvd.
    Ste 204 #1118
    Cleveland, OH 44120

    Business Hours

    Monday - Friday: 8:00 AM - 6:00 PM
    Saturday: Closed
    Sunday: Closed

    Need Warehouse Relocation in Akron?

    Call (216) 434-6607 or request a quote and we will get a layout started.

    (216) 434-6607
    Tap to Call